Isparta Youth and Sports Provincial Directorate Ground Project Completed
- The old coating was removed, the floor was wiped and cleaned.
- Concrete was primed and EPDM flooring system was applied.
- Game lines were drawn in accordance with the project.
- Sports equipment was produced and assembled.