Erzurum – Field and Ground Project

Erzurum – Field and Ground Project Completed.

  • It was Wiped and Cleaned with a Floor Wiping Machine.
  • Adherence was increased with Concrete Epoxy Primer.
  • Acrylic Flooring System was applied to the floor.
  • Game Lines Drawn and Field Delivered.
Acıbadem Mahallesi Gayretli Sokak No:14 D:7 Üsküdar/İstanbul - Turkiye
Mon. - Sat.: 8:30-18:30
All Rights Reserved to Bilgili İnşaat. Copyright © 2020 | This site is made by Mira Net