Şehrizar MansionsWalking Path Epdm Floor Covering System Project
20 June 2023HATAY / Indoor and Outdoor Sports Field Ground Project Completed.
12 July 2023Kayseri Şeker / Kayseri Synthetic Grass Floor Covering System Project
Completed
- Felt was laid on the ground, which was filled with gravel and leveled and compacted.
- 55mm monofilament Synthetic Grass Floor Covering was glued onto the felt.
- Sbr granules and sand were distributed equally on the carpet.
- The field was delivered after brushing with an ATV.
Project Pictures: