Beşiktaş / Shipyard Ground System Project Completed 8+7 mm Epdm Floor Covering System was installed on the floor. Aromatic Binder Was Used for Tile and Green Colored Epdm Granules. Game Lines Have Been Drawn and The Field Has Been Delivered. Project Pictures:
The first choice of companies