Çukurova / Adana – Akın Özdemir Park Walking Path Project
11 May 2023Bolu Municipality – Earthquake Monument and Museum Ground Project
19 May 2023Kayseri – Children’s Park and Sports Fields Ground Project Completed.
- Basic System Acrylic Flooring System on Concrete Floor was Made.
- The field was handed over by drawing the game lines.
- 8+5 mm Epdm Floor Covering System Was Made On The Floor Of The Children’s Playground.
- Pattern Work Was Made Using Colored Epdm Granules.
- Aliphatic Binder Used for Blue Color Epdm Granules
- Aromatic Binder was used for Tile, Green, Orange colored Epdm Granules.