Çekmeköy Campus Tartan Track Project Completed.
21 November 2024Hadımköy/Istanbul Rubber Coating Project
25 November 2024Maslak/Istanbul Tennis Court Acrylic Floor Coating Project Completed.
- The floor was wiped and cleaned with a floor polishing machine.
- Adherence was increased with Concrete Epoxy Primer.
- Acrylic Floor Coating System was applied to the floor.
- Game Lines were drawn and the field was delivered.