Beşiktaş / Shipyard Ground System Project Completed
- 8+7 mm Epdm Floor Covering System was installed on the floor.
- Aromatic Binder Was Used for Tile and Green Colored Epdm Granules.
- Game Lines Have Been Drawn and The Field Has Been Delivered.
Project Pictures: