Beşiktaş / Shipyard Ground System Project
15 July 2023IAAF Approved Athletics Track Project in Denizli / KYK Field
10 November 2023Mamak / Ankara Floor Covering System Project Completed.
- 13+7 mm Epdm Floor Covering system was installed.
- Pattern Work was Made Using Colored Epdm Granules.
- Aliphatic Binder Was Used for Blue Colored Epdm Granules.
- Aromatic Binder Was Used for Yellow Orange Colored Epdm Granules.
Project Pictures: